Quality Assurance
Downloads
Bobbin Production Process
Taking Orders
Review customer specifications, drawings and order requirements before production planning.
Quality Control Instruction
Confirm material, tooling and quality requirements before work is released.
Injection
Form bobbin components with controlled injection molding parameters.
Deburring
Remove excess material and prepare molded parts for assembly.
Pin Insertion
Insert terminals and pins according to the approved product specification.
Pin Soldering Test
Test soldering and pin condition before moving to pull-force checks.
Pin Pull Test
Verify pin retention strength against production requirements.
Full Examination
Inspect molded geometry, pins and visible quality before packaging.
Packaging
Pack accepted parts for protection, traceability and shipment readiness.
Full Examination Before Delivery
Complete a final examination before release to logistics.
Deliver to the Customer
Ship finished products to the customer with required documents.